Phase 3 – Production Ready

Requirements

The purpose of phase three is to transition from prototype to full production. Additional algorithms may be added and will be field tested on actual data. The software will undergo safety requirements testing and have the GUI refined.

Goal

Our goal is to design the final solution that is completely ready to go to production.

Required to Start

Main Tasks

Algorithm

  • Additional Algorithms
  • Field Test on Actual Data

Software

  • Safety Requirements Testing
  • Custom Features
  • Refine GUI

Hardware

  • Schematic ECO
  • PCB ECO
  • Pilot Production Run
  • EMI/EMC
  • Cost Down

Phase 3 Deliverables

Upon successful exit from phase three, D3 will provide you with:

  • Engineering Release Package
    • - Schematics
    • - GERBERS
    • - Mechanical Drawings
    • - Software
  • Complete Documentation
  • Pilot Production Demo
  • End of Line Test Fixture